Bought with Alexandra Brice • United Real Estate Executives
For more information regarding the value of a property, please contact us for a free consultation.
4434 MARRIOTTSVILLE RD Owings Mills, MD 21117
Want to know what your home might be worth? Contact us for a FREE valuation!

Our team is ready to help you sell your home for the highest possible price ASAP
Key Details
Sold Price $650,000
Property Type Single Family Home
Sub Type Detached
Listing Status Sold
Purchase Type For Sale
Square Footage 2,312 sqft
Price per Sqft $281
Subdivision Windsor Mill
MLS Listing ID MDBC2126290
Sold Date 06/27/25
Style Colonial
Bedrooms 4
Full Baths 3
Half Baths 1
HOA Fees $24/ann
HOA Y/N Y
Abv Grd Liv Area 2,312
Year Built 1993
Available Date 2025-05-02
Annual Tax Amount $4,803
Tax Year 2024
Lot Size 0.320 Acres
Acres 0.32
Property Sub-Type Detached
Source BRIGHT
Property Description
Be prepared to fall in love with this stunning 4-bedroom, 3.5-bathroom home with a 2-car garage, perfectly situated on a private, tree-lined lot on a quiet street. From the moment you arrive, the manicured lawn and charming curb appeal offer a preview of the thoughtful design and care you'll find throughout. Step into a grand two-story foyer with custom millwork and stylish designer touches that create a welcoming, luxury feel the moment you walk in. The kitchen is clean, modern, and inviting, with sleek lighting and a smart layout that flows seamlessly into the spacious family room—perfect for both everyday living and effortless entertaining. But the true showstopper? The backyard. A recently installed Trex deck leads to a private in-ground pool with crystal-clear water, surrounded by lush landscaping and mature trees. This rare lot offers peace, privacy, and a picture-perfect setting for summer days and starry nights. It's more than a yard— this backyard is a true oasis that feels like a resort getaway—no passport required. Upstairs, you'll find four generously sized bedrooms, including a serene primary suite with a walk-in closet and a renovated spa-like en-suite bathroom. The thoughtfully updated secondary bathroom offers plenty of space and updated finishes, providing comfort and function for the whole household. A convenient upstairs laundry room adds to the home's everyday ease. The layout is truly a dream come true! The finished basement adds even more flexibility with a large rec room and a bonus den—perfect as an office, gym, or playroom. Meticulously maintained with recent updates including new roof (2017), new HVAC (2017), and new windows throughout (2018). This home is located on a quiet street just minutes from schools and shopping, and combines comfort, space, and an unbeatable location. This is more than a home—it's a lifestyle. Come see it for yourself!
Location
State MD
County Baltimore
Zoning R
Rooms
Other Rooms Den
Basement Fully Finished
Interior
Hot Water Natural Gas
Heating Central
Cooling Programmable Thermostat, Central A/C
Fireplace N
Heat Source Natural Gas
Exterior
Parking Features Garage - Front Entry, Garage Door Opener, Inside Access
Garage Spaces 2.0
Pool In Ground
Water Access N
Accessibility None
Attached Garage 2
Total Parking Spaces 2
Garage Y
Building
Story 3
Foundation Permanent
Above Ground Finished SqFt 2312
Sewer Public Sewer
Water Public
Architectural Style Colonial
Level or Stories 3
Additional Building Above Grade, Below Grade
New Construction N
Schools
School District Baltimore County Public Schools
Others
Senior Community No
Tax ID 04022200010667
Ownership Fee Simple
SqFt Source 2312
Special Listing Condition Standard
Read Less

GET MORE INFORMATION
